Final design for the segmental alternate of this major bridge project using balanced cantilever erection with an overhead gantry. |
|
Lee Roy Selmon Crosstown Connector, I-4 over 26th Street, Tampa, FL |
Final Design for the crossing of I-4 Ramps B and C over 26th Street. Bridges consist of single span florida U-beam girders on pile supported end bents. |
|
|
SR 9A SR 202 (JTB) Interchange, Jacksonville, FL |
Final design and load rating of the segmental alternative of this major interchange. |
|
Smokehouse Bay Bridges Marco Island, FL |
Conceptual design of twin bridges using a single inclined arch and a post-tensioned concrete bridge deck for this low level water crossing. |
|
|
|
|
|