Construction Engineering
Lee Roy Selmon Crosstown Expressway, Tampa, FL
a2beng004010» Construction Analysis
» Falsework Design
» Launching Girder Modifications
» Design of temporary walls
 
Link Light Rail Soundtransit, Seattle, Washington
»a2beng004008 Integrated Shop Drawings
» Span-by-span and cantilever erection
» Straddle Bents
 
Cady Way Trail over SR 436, Orlando, FL
a2beng004001Construction Analysis for erection of steel arch bridge with post-tensioned concrete deck during coring for the anchor bolt installation.
 
PR 148 Bridge over La Plata River, Naranjito, PR
a2beng001003 » Integrated Shop Drawings
» Falsework Desing
» Construction Analysis
 
SR 9A SR 202 (JTB) Interchange, Jacksonville, FL
a2beng004007As-built analysis and preparation of repair procedure for the restoration of the main pier cap reinforcement that was damaged during coring for the anchor bolt installation.